You don't have javascript enabled. Good luck with that.
Pencarian
659 Lampu Akan Dipasang di Kolong JLNT Ciledug-Tendean

659 Lamps to Light Up Under Transjakarta Corridor 13

Around 659 streetlight lamps type ceiling will be installed under the flyover of Transjakarta plying Corridor 13 (Ciledug-Tendean) in the near future.

And now we will continue to the bottom

Suryanto, Head of South Jakarta Industry and Energy Sub-dept. said 330 lamps have been installed at the top of the flyover.

"And now we will continue to the bottom," he expressed, Thursday (7/12).

PE Dept. Installs 57,101 Smart LED Lamps This Year

Thus far its installation on the bottom has entered the stage of making streetlight pole foundation at 130 points. 

It is hoped able to smoothen the operational of Transjakarta bus at the corridor, including for other passing vehicles.

As for the information, streetlight lamps type armatur installed at the top of the flyover have 200 watts power. The lamp itself is LED smart system.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5566 personBudhi Firmansyah Surapati
  2. Check Saturday's Traffic Diversions for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye917 personAldi Geri Lumban Tobing
  3. MRT Jakarta Prolongs Weekend Service for Kanye West Concert

    access_time23-10-2026 remove_red_eye822 personAldi Geri Lumban Tobing
  4. MRT Jakarta Modifies Schedule for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye798 personAldi Geri Lumban Tobing
  5. Jakarta–Turkey Film Production to Begin Filming in 2027

    access_time22-10-2026 remove_red_eye742 personBudhi Firmansyah Surapati